WoodComp

Canfor Fort St. John

Closed 2024Canadian Forest Products Ltd.CanforID 01716

Canfor Fort St. John is a closed softwood sawmill in Fort St John, Canada, owned by Canfor. With a capacity of 489 000 cubic metres of sawn timber per year it is the 11th largest of the 116 sawmills in Canada with a recorded capacity.

Location and logistics

Location
Fort St John, British Columbia, Canada
Site
Shares the industrial site with the facilities listed. Each is its own record with its own capacity and status.
Nearest port
Prince Rupert · 642 km
Straight-line distance to the nearest major port. Method
Rail siding
Not yet verified
OpenStreetMap track way/1014989289 ↗, 74 m from the site point. Method
Nearest railway
0.1 km
Map

Capacity and output

Capacity
about 489 000 m3/y sawn timber
reported as 288 MMBF/y
Production
Not reported

Raw material and products

History and sources

Data confidence: High (90 of 100) · methodology

Timeline

  1. closure2024
    Permanent closure announced on 4 September 2024 due to the persistent challenge of accessing economic fibre, sustained financial losses, depressed lumber markets and increased US tariffs, with about 500 workers affected across the Fort St. John and Plateau mills.
    Source ↗

Sources

  1. otherchecked 2026-07-27
    cbc.ca ↗
  2. company websitechecked 2026-09-09
    canfor.com (archived copy) ↗
  3. otherchecked 2026-07-30
    catalogue.data.gov.bc.ca ↗
Show all 4 sources
  1. otherchecked 2026-10-18
    canfor.com ↗

Report a data error

Related facilities

How to cite

WoodComp (). Canfor Fort St. John (WoodComp ID 01716). WoodComp facility database, version 2026-11. Accessed the date you retrieved it. https://woodcomp.world/id/1716

Data © WoodComp, licensed CC BY-SA 4.0. Attribution required.