WoodComp

Maderas Arauco Planta Horcones II

Closed 2023Maderas Arauco S.A.AraucoID 01557

Maderas Arauco Planta Horcones II is a closed softwood sawmill in Arauco (Horcones), Chile, owned by Arauco. With a capacity of 300 000 cubic metres of sawn timber per year it is the 7th largest of the 13 sawmills in Chile with a recorded capacity.

Location and logistics

Location
Arauco (Horcones), Bío-Bío, Chile
Nearest port
Coronel · 21 km
Straight-line distance to the nearest major port. Method
Rail siding
No siding mapped
OpenStreetMap track way/1034000337 ↗, 558 m from the site point. Method
Nearest railway
0.6 km
Map

Capacity and output

Capacity
300 000 m3/y sawn timber
Annual report
Production
Not reported

Raw material and products

Fibre

History and sources

Data confidence: High (84 of 100) · methodology

Timeline

  1. closure2023
    Closed in July 2023 as Arauco called the situation for its wood business in Chile unsustainable, citing raw material supply problems, timber theft, forest fires and costs from rural violence and roadblocks, with about 121 workers dismissed.
    Source ↗

Sources

  1. annual reportchecked 2026-09-08
    sec.gov ↗
  2. directorychecked 2026-09-09
    bibliotecadigital.infor.cl (archived copy) ↗
  3. otherchecked 2026-07-27
    arauco.com ↗
Show all 8 sources
  1. otherchecked 2026-07-27
    diarioconcepcion.cl ↗
  2. otherchecked 2026-07-27
    acoforag.cl ↗
  3. otherchecked 2026-09-10
    services.arcgisonline.com ↗
  4. otherchecked 2026-09-14
    services.arcgisonline.com ↗
  5. otherchecked 2026-09-14
    datosretc.mma.gob.cl ↗

Report a data error

Related facilities

How to cite

WoodComp (). Maderas Arauco Planta Horcones II (WoodComp ID 01557). WoodComp facility database, version 2026-11. Accessed the date you retrieved it. https://woodcomp.world/id/1557

Data © WoodComp, licensed CC BY-SA 4.0. Attribution required.