WoodComp

Arbaflame ArbaOne

OperatingArbaflame ASPEARL Infrastructure Capital II (65 procent sedan 2025)arbaflame.noID 02407

Arbaflame ArbaOne is an operating pellet plant in Grasmo (Kongsvinger), Norway, owned by PEARL Infrastructure Capital II (65 procent sedan 2025). With a capacity of 70 000 tonnes per year it is the 2nd largest of the 5 pellet plants in Norway with a recorded capacity.

Location and logistics

Location
Grasmo (Kongsvinger), Norway

location pending verification

Capacity and output

Capacity
70 000 t/y pellets
Production
Not reported

Raw material and products

Raw material
Sawdust and shavings
Also produces

History and sources

Data confidence: High (80 of 100) · methodology

Timeline

  1. other2026-10-13
    Added 2026-10-13: pellet plant added in the company sites and ENplus population pass, capacity 70000 t/y pellets.
    Source ↗

Sources

  1. company websitechecked 2026-10-13
    arbaflame.no ↗

Report a data error

Related facilities

How to cite

WoodComp (). Arbaflame ArbaOne (WoodComp ID 02407). WoodComp facility database, version 2026-10. Accessed the date you retrieved it. https://woodcomp.world/id/2407

Data © WoodComp, licensed CC BY-SA 4.0. Attribution required.