WoodComp

RingAlm Hauerseter

Also known as Södra Timber Romerike, Romerike Trelast

OperatingRingAlm ASRingAlmringalm.noID 01399

RingAlm Hauerseter is an operating softwood sawmill in Norway, owned by RingAlm. With a capacity of 60 000 cubic metres of sawn timber per year it is the 8th largest of the 9 sawmills in Norway with a recorded capacity.

Location and logistics

Nearest port
Oslo · 41 km
Straight-line distance to the nearest major port. Method
Rail siding
Own siding
Verified by satellite 2026-10-02
OpenStreetMap track way/273138336 ↗, 217 m from the site point. Method
Map

Capacity and output

Capacity
60 000 m3/y sawn timber
Production
Not reported

Raw material and products

History and sources

Data confidence: Medium (74 of 100) · methodology

Timeline

  1. ownership change2015
    Sodra Timber closed its Hauerseter sawmill in September 2015; RingAlm Tre AS took over sawing and planing at the site (RingAlm AS was sold to a new ownership consortium in July 2020).
    Source ↗

Sources

  1. otherchecked 2026-07-25
    naylornetwork.com ↗
  2. other×3checked 2026-07-27
    data.brreg.no ↗
  3. company websitechecked 2026-09-09
    paragonn-cdn4.ams3.digitaloceanspaces.com ↗
Show all 7 sources
  1. company websitechecked 2026-10-08
    ringalm.no ↗
  2. otherchecked 2026-08-09
    server.arcgisonline.com ↗
  3. otherchecked 2026-10-02
    openstreetmap.org ↗
  4. industry presschecked 2026-10-10
    viken.skog.no ↗

Report a data error

Related facilities

How to cite

WoodComp (). RingAlm Hauerseter (WoodComp ID 01399). WoodComp facility database, version 2026-11. Accessed the date you retrieved it. https://woodcomp.world/id/1399

Data © WoodComp, licensed CC BY-SA 4.0. Attribution required.